12:22. Leading activator
Leading activator
Removal
| PERFORMANCE ORDER |
| 1) remove decorative finishing of a door; for weakening of a lock ring draft of lever transfer 1 and the leading activator have to be in situation "the door is open" |
| 2) keeping draft of lever transfer 1, push a lock ring 2 down |
| 3) extend draft of lever transfer from the activator |
| 4) remove a pressure head / vacuum hose and unscrew assembly bolts |
| 5) remove a mnogoshtyrkovy connector |
|
Installation
Carry out installation upside-down, in view of the following:
| PERFORMANCE ORDER |
| 1) establish draft of lever transfer 1, the lock and the leading activator in situation "the door is open" |
| 2) press draft, pushing a lock ring 2 up |
|
Leading activator (Coupet's model)
Removal
| PERFORMANCE ORDER |
| 1) remove decorative finishing of a door; for weakening of a lock ring draft of lever transfer 1 and the leading activator have to be in situation "the door is open" |
| 2) keeping draft of lever transfer 1, push a lock ring 2 down |
| 3) pull out draft from the activator (shooter) |
| 4) remove a pressure head / vacuum hose and unscrew fixing bolts |
| 5) remove a mnogoshtyrkovy connector |
|
Installation
Carry out installation upside-down, in view of the following:
| PERFORMANCE ORDER |
| 1) establish draft of lever transfer 1, the lock and the leading activator in situation "the door is open" |
| 2) press draft, pushing a lock ring 2 up |
|