a43d3481

8.8.4. Removal and installation of the transmission

Removal

PERFORMANCE ORDER
1) disconnect a wire of the negative plug of the accumulator
2) disconnect the socket of connection of a speedometer
3) disconnect the socket of connection of the temperature switch
4) remove the top bolts of fastening of the engine and transmission
5) disconnect the socket of connection of the sensor of oxygen
6) disconnect a wire of grounding of the transmission
7) establish an engine support
8) remove the lower filter of the engine and fastening
9) remove an exhaust pipe
10) disconnect half shafts from the transmission
11) remove starter bolts
12) put a starter sideways and fix by means of a wire
13) remove nuts of fastening of the hydrotransformer (3 pieces)
14) remove the heat-shielding screen of the multipurpose switch
15) disconnect sockets of connection 1, 2 and 3
16) remove a clip a wire from the transmission
17) disconnect tubes of liquid of cooling of the automatic transmission
18) muffle hoses by means of caps, a detail of 357 853 586 V
19) muffle tubes rubber caps, a detail 055 121 324
Prevention

Numbers of details are provided only for footnotes.


20) establish a support or the suitable elevator under the transmission
21) remove fastenings of the transmission
22) remove a switching lever clip
23) disconnect a rope
24) remove the lower bolts of fastening of the engine / transmission
25) allocate for a half shaft back
26) disconnect the transmission from the engine
27) accurately lower the transmission
28) support the hydrotransformer that it did not fall

Installation

Installation is carried out upside-down removals, at the same time pay attention to the next moments:

PERFORMANCE ORDER
1) check that at installation the directing plugs were installed precisely
2) check adjustment of a rope of the lever of gear shifting
3) adjust a rope if it is necessary

Inhaling moment:

Fastening of half shafts to drive flanges 80 N of m.
Bolts of fastening of the hydrotransformer 60 N of m.
Bolts of fastening of the transmission to the engine (4-cylinder) 55 N of m.
Bolts of fastening of the transmission to the engine (5-cylinder): see the table the inhaling Moments (5-cylinder engines)
Fastening of an arm of the transmission to the transmission 40 N of m.
Fastening of the transmission to a body 110 N of m.

Fastening


Prevention

Numbers of details are provided only for footnotes.


before installation of the engine, check that pins stood still

Positions A and B – centering plugs

For some transmissions installed on the 5-cylinder engine it is necessary to install the rejecting plug (a detail 012 301 153).

At installation of the new engine, check existence of the plug on cranked to a shaft. This plug has to be installed by the first, before installation of a drive plate.

Numbers of details are provided only for footnotes. Address your dealer for obtaining the last information.

Inhaling moments (5-cylinder engines)

Position Bolt size Quantity Inhaling moment (N. of m)
1 M12x67 1 65
2 M12x80 3 65
3 M12x90 1 65
4 M12x100 1 65
5 M12x120 1 65
6 M12x50 1 45
7

M12x38

1 45
8 M12x40 2 25

Case, gear wheels, shaft / Mechanism of the automatic transmission

 

1. Cover
remove by means of the screw-driver
establish by means of the plug 40-20
2. A bolt – the moment of an inhaling of 30 N. of m.
for a small leading shaft
3. Washer
4. Washer
for drove planetary transfer
5. Transmission case
6. Washer
uvulas are turned to persistent needle
to the bearing
7. Persistent needle bearing
establish together with washers on drove
planetary transfer
8. Washer
9. Sealing ring
always replace
is established on drove planetary
transfers
10. Drove planetary transfer
grease washers and the needle bearing a little
establish washers and the needle bearing
on drove planetary transfer, and then
establish rings of planetary transfer
11. Washer
for a brake of transfer of a backing (B1)
12. Internal shlitsevy ring
before installation of new rings, keep them in liquid of the automatic transmission
within 15 minutes
13. External shlitsevy ring
14. Press ring
the flat party is turned to rings
15. Spring of rings
the curved party is turned to the unilateral coupling
16. Unilateral coupling
with the B1 piston
17. Lock ring
for the unilateral coupling
after installation of a lock ring, establish a maslootrazhatel
18. Maslootrazhatel
is established in a box case flute
transfers (near an air vent
liquids of the automatic transmission)
establish a reflector after installation of the unilateral coupling and before installation
lock ring of a fixing rim
19. Lock ring
for a fixing rim
before installation of a lock ring, check that the unilateral coupling and a maslootrazhatel were installed
20. Central cogwheel, small
is established on drove planetary transfer
21. Washer
establish by the roundish party to a small central cogwheel
22. Persistent needle bearing
23. Central cogwheel, big
is established on drove planetary transfer
24. Washer
is established by the slanted party in a big central cogwheel
25. Persistent needle bearing
26. Leading shaft, big
is established on drove planetary transfer
27. Persistent needle bearing
28. Needle bearing
29. Leading shaft, small
is established on drove planetary transfer

30. Persistent needle bearing
the washer can be established on the needle bearing
the bearing is turned to a small leading shaft
31. Washer
uvulas are turned to the persistent needle bearing
the washer can be established on the needle bearing
32. The coupling 3-ey/of the 4th of transfers (K3) with a pump shaft
33. Washer
uvulas are turned to the persistent needle bearing
34. Persistent needle bearing
35. Washer
36. The coupling of the 1st – the 3rd transfers (K1)
with a turbine shaft
37. Washer
for adjustment of a free wheeling of K1 and K2 couplings (if it is necessary, the second washer is established)
38. Washer
for adjustment of a free wheeling of K1 and K2 couplings (if it is necessary, the second washer is established)
39. Coupling of a backing (K2)
40. Fixing rim
is established so that klinyshka of the unilateral coupling entered a flute
41. External shlitsevy ring
always establish an external ring 3 mm thick
42. Internal shlitsevy ring
before installation of new rings, keep them in liquid of the automatic transmission within 15 minutes
43. Spring cap
remove all three
establish after installation of the first external shlitsevy ring
44. External shlitsevy ring
always establish an external ring 2 mm thick
45. Spring
remove all three
establish after installation of all external shlitsevy rings
46. Spring cap
remove all three
establish before installation of the last external shlitsevy ring
47. External shlitsevy ring
48. Spring washer, concave
49. Laying
always replace
50. Sealing ring
always replace
is established on the pump of cooling liquid of the automatic transmission
51. Pump of cooling liquid of the automatic transmission
52. 10 N. of m.

Oil filter, provision of installation


Mechanism of cooling of the automatic transmission
1. The feeding hose
the fastening inhaling moment to the oil pallet of 80 N. of m.
2. 10 N. of m.
3. Sealing ring
always replace
4. nut
moment of an inhaling of 69 N. of m.
5. Washer
always replace
6. Transmission case
7. Filter of cooling liquid of the automatic transmission
it is possible to replace, without removing the engine
8. The probe for measurement of level
cooling liquid of the automatic transmission
9. Radiator
with the established radiator
cooling liquid of the automatic transmission
10. Washer
always replace
11. Return pipeline of a radiator of cooling liquid of the automatic transmission
moment of an inhaling of a returnable tube of 40 N. of m.
12. Washer
always replace
13. Bolt of "banjo" connection,
moment of an inhaling of 40 N. of m.
14. Clip
15. Washer
16. 10 N. of m.
17. Bolt of "banjo" connection, moment of an inhaling of 30 N. of m.
18. 10 N. of m.
19. Temperature switch, moment of an inhaling of 15 N. of m.
20. Washer
always replace
21. The feeding tube of liquid of the automatic transmission
the fastening inhaling moment to the feeding m 40 N.' pipeline.
22. Bolt of "banjo" connection, moment of an inhaling of 30 N. of m.
with an opening for the temperature switch
23. Washer
always replace
24. Tube of return of cooling liquid of a radiator of the automatic transmission
the fastening inhaling moment to the return pipeline of 40 N. of m.
25. Bolt of "banjo" connection, moment of an inhaling of 40 N. of m.
26. Sealing ring
always replace
27. The feeding pipeline of a radiator of cooling liquid of the automatic transmission
the moment of an inhaling of fastening of the feeding m 40 N.' tube.
28. Washer
always replace