a43d3481

2.1.2. Removal and installation of the engine (5-cylinder models)

Removal

PERFORMANCE ORDER
1) disconnect the cable connecting the rechargeable battery to weight
2) on models with mechanical transmission remove the working cylinder of a hydraulic actuator of coupling
3) remove the pump of the hydraulic booster of steering (together with hoses) and attach to a body
4) remove a compressor arm together with bolts of fastening and take aside
5) bind the compressor a wire into place
6) disconnect radiator hoses
7) keep antifreeze for further use
8) remove a radiator assembled with the fan, a casing and the directing device
9) remove a bumper
10) remove the central guard, the lower cross-piece
11) turn off the left lower bolt of fastening of the check point to the engine
12) uncover the distributor, put aside
13) prepare for a traverse 10-222A
14) establish a coupling hairpin 3147 so that not to damage high-voltage wires
15) screw a coupling hairpin 3147 in an opening of the turned-out bolt of fastening of the check point
16) establish a cross-piece 10-222A on internal otbortovka of mudguards of forward wings
17) attach a hook of the lifting device according to the drawing

18) lift or lower the check point on the necessary height, rotating a lambskin nut of a coupling hairpin

Inhaling moments

Bolts of fastening of the check point to the engine:
  – M8
20 N of m.
  – M10
45 N of m.
  – M12
56 N of m.
Fastening of an exhaust pipe to a check point arm
25 N of m.
Fastening of an exhaust pipe to a final collector
35 N of m.
Fastening of a forward support of the engine to a body
70 N of m.
Fastening of the torsion limiter to the engine
45 N of m.
Fastening of pillows of the engine to support
45 N of m.
Fastening of the limiter to the lower basic cross-piece
45 N of m.
Bolt of M10 of fastening of the generator to the engine
45 N of m.
Bolt of M8 of fastening of the generator to the engine
35 N of m.
Fastening of the pump of the power steering
20 N of m.

The inhaling moments for Coupet's models

Bolts of fastening of the check point to the engine:
  – M8
20 N of m.
  – M10
45 N of m.
  – M12
60 N of m.
Fastening of the right and left support of the engine
45 N of m.
Fastening of the compressor of the conditioner to an arm
25 N of m.
Fastening of an exhaust pipe to a check point arm
25 N of m.
Fastening of pillows of the engine to support
40 N of m.
Fastening of support of the engine to a body

40 N of m.


Installation

Installation of the engine is carried out as it should be the return to removal.

PERFORMANCE ORDER
1) check wear of the release bearing of coupling, if necessary replace
2) slightly grease the release bearing of coupling and a main shaft of the check point with lubricant on the basis of molybdenum sulfide
3) be convinced that the aligning pins of joining of the engine with the check point are on the block of cylinders
4) in support of the engine replace самоконтрящиеся nuts
5) lower the engine on support
6) screw самоконтрящиеся nuts of support
7) to a pomanipuliruyta the engine (by a kantovaniye) for the correct landing to support
8) adjust a cable of management of a butterfly valve
9) attach all electrical wiring
10) fill the engine with cooling liquid
11) check and if necessary restore oil level
12) adjust a tension of a gear belt of the drive of a cam-shaft and turns of idling
13) without using great efforts level in the place of a detail of the exhaust system